Design & Installation   email: dplantmann@cs.com
Home Up Consulting Design Training Education Resources

SERVING THE MIDWEST (since 1990)

________________________________________________________________________________________________________________________________

We design and install many different active and passive types of water features. Our philosophy is to make these structures fit in to the surrounding area, while looking as natural as possible. The goal with active systems and pond construction is to make a living ecosystem whenever possible. The goal with passive systems is to control the flow of water, when present.  To achieve these goals and to attract the largest group of pond inhabitants possible, we provide the highest quality materials available in the industry and use no chemicals. Our construction team uses the best flexible fish safe liners, all natural stone, high efficiency pumps and quality plumbing.

Pond in Winter  Sideyard Water Features with Bridge  Prairie Grove Pond-less Stream  Pond-less Waterfall  A Beautiful Water Feature   A Relaxing Escape  Complete Ecosystem  Winter Beauty Waterfall & Stream

Our Water Features focus on movement of water, sound, area usage and proper placement of materials. Prior to starting on a water feature design, we meet with you on site to share ideas. Our goal is to create a natural looking water feature which meets your needs, fits the site and functions properly.

Since the design and installation of water features has a high degree of artistic interpretation, the layout designs we do are simplistic, yet technical in nature. Our main design focus is view, flow and placement of components.

There is a small charge to physically come out to a location. This charge can be subtracted if work is done through Root Feeders, Inc. A standard contract is required prior to an installation being scheduled. In season (Apr. - Oct.) a 50% deposit is required when the contract is signed. Off season (Nov. - Mar.) a 25% deposit is required when the contract is signed, with an additional 25% deposit due prior to work starting.